Name of Work- South Eastern Railway-Soil Investigation, Survey making and Supplying Drawing along with design details for major Bridge in Connection with Bargachia- Champadanga, Tarakeshwar Champadanga and Bowaichandi- Arambag new BG Rail Line Projects. of S.E. Railway.
Work completion Date- 12.02.2012
Project Cost-Approx. Value of Consultancy Services (In Rs.): 20,24,501/-
Description of Work-
Narrative Description of Project:
- of Major Bridges – 13
- Preparation of Report
- 1 Span of 61m.
Detail description of actual services provided by the firm under different categories:
- Detail Structural design.
- GAD & structured drawings for each bridge, culvert & CD works.
- Detailed Project Report.
- Soil Investigation
- Preparation of GAD
- Preparation of Geometric design & report.
- Proof Checking from IIT Roorkee