Name of Work- Soil exploration, hydraulic data collection and calculation for minor and major bridges, fixing of alignment based on survey and available survey records, preparation of land records as per land acquisitions, preparation of L-Sections and design and drawing of bridges for Gauge Conversion from MG to BG between Bhuj-Naliya with extension up to Vayor.
Work completion Date- 31st Aug. 2017
Project Cost- 55,34,435
Survey- 25 Kms
Description of Work- Soil exploration, hydraulic data collection and calculation for minor and major bridges, fixing of alignment based on survey and available survey records, preparation of land records as per land acquisitions, preparation of L-Sections and design and drawing of bridges for Gauge Conversion from MG to BG between Bhuj-Naliya with extension up to Vayor.
preparation of L-Sections & Plan Approved alignment at an interval of 40m: 101.40Kms.
preparation and submission initial & final design & drawing of existing/ new bridges to suit 25 tunes loading 2008 including necassary structure design of sub structure and super structure- Major Bridges-7 nos & Minor Bridges 87nos.