Since 1999 | ISO Certified

Preparation of Feasibility cum Detailed Project Report for the Work of Fly over at Sujata Chowk

Road Construction Department

Preparation of Feasibility cum Detailed Project Report for the Work of Fly over at Sujata Chowk

Name of Work- Consultancy Services for Preparation of Feasibility cum Detailed Project Report for the Work of Fly over at Sujata Chowk in Ranchi in the State of Jharkhand.

Work completion Date- 27.12.2012

Project Cost- 64.10 Crores

Survey-

  1. Traffic Surveys, Analysis and feasibility Report.
  2. Topographical Surveys, Technical & Financial Viability.
  3. Geo-technical Investigations and Sub-Soil Exploration. .(3 Bore-Holes: 61.5 RMT)

Description of Work-

Narrative Description of Project:

  • of Major Bridges – 1, Length of bridge- 225m
  • Preparation of Report.
  • of span-8
  • 7 span of 30m
  • 1 span of 15m

Detail description of actual services provided by the firm under different categories:

  1. Traffic Surveys, Analysis and feasibility Report.
  2. Topographical Surveys, Technical & Financial Viability.
  3. Geo-technical Investigations and Sub-Soil Exploration. .(3 Bore-Holes: 61.5 RMT)
  4. Preparation of Index Plan, Site Plan & Alignment Plan, GAD, Strip Plan.
  5. Preparation of Horizontal/Vertical Alignment & cross section of approach.
  6. Detailed Structural Design of Flyover.
  7. Cost Estimation, Environment and Rehabilitation Aspects.
  8. Economic & Financial Analysis.
  9. Preparation of implementation programme.
Open chat
1
Hello
How can we help you?