Name of Work- Lonavala Municipal Council: Preparation of Detailed Project Report of Roads & Bridges for Lonavala Municipal Council under UIDSSMT
Work completion Date- 30.09.2009
Project Cost- 256.06 Crores
Description of Work-
Description of Actual Services Provided by your Staff: Detailed Project Report:-
- Study of Existing Condition of Roads.
- Study of Existing Condition of C.D. Works.
- Carry out the detail survey of all internal roads in LMC.
- The traffic study has been carried out at four locations.
- Ward wise Population Projection & Density Calculation for year 2001, 2009, 2025 & 2040.
- Taking photographs of existing conditions of roads & CD works & ROB’s.
- Preparation of Trial Pit Results for calculation of crust details.
- Identification of problems & need for Proposed road.
- Further project is divided into eight categories as below.
-
- Existing Asphalt to Proposed Concrete Road having Avg. Width varies from 3.75m to 10.50 m- Having total Length of 42.80 km
-
- Proposed Concrete Road having Avg. Width varies from 3.75m to 10.50 m- Having total Length of 13.26 km
-
- WBM to Proposed Asphalt road having Avg. Width varies from 3.75m to 10.50 m- Having total Length of 2.20 km
-
- Existing WBM to Proposed Concrete Road having Avg. Width varies from 3.75m to 10.50m Having total Length of 5.20 km
-
- Existing Cart track to proposed Concrete Road having Avg. Width varies from 3.75m to 10.50m Having total Length of 2.80 km
- Existing cart track to proposed asphalt road having Avg. Width varies from 3.75m to 10.50m Having total Length of 0.250 km
- Proposed Asphalt Road having Avg. Width varies from 3.75m to 10.50m Having total Length of 0.440 km
- Existing Asphalt to Asphalt treatment Road having Avg. Width varies from 3.75m to 10.50m Having total Length of 7.50 km
-
-
- For all above categories Design of Flexible & Rigid pavement is carried out.
- Estimates including land acquisition are carried out for roads.
- Design & Estimates of Proposed CD works are carried out.
- Design & Estimates of Proposed ROB’s are carried out.
- Financial pattern of the scheme is formulated.
- Total Annual Burden, Operation & Maintenance cost of the project is studied.
-