Name of Work- Preparation of Detailed Project Report for In-Village System Infrastructure in Udupi District.
Work completion Date- 19.03.2021
Project Cost- Rs. 22.75 Crore
Survey-
- Topographical Survey (123 Villages)
- Preparation of Contour Map.
- Topographical Survey for ESR & GSR
Description of Work-
- Topographical Survey (123 Villages)
- Preparation of Contour Map.
- Topographical Survey for ESR & GSR
- L-SECTION drawing of Raw water rising main of 400 mm dia. DI K-9 pipeline having length
- L-SECTION drawing of pure water gravity mains feeding different resources of pipeline with varying diameters from 100 mm to 300 mm.
- Typical drawing of connections for proposed Service Reservoirs with varying capacities
- Drawing & Design of Distribution Line
- Validation of Survey & Investigation
- Detailed Cost Estimates & Financial Analysis
- PMC Services