Name of Work- Lonavala Municipal Council: Preparation of Detailed Project Report of Sewerage System for Lonavala Municipal Council under UIDSSMT
Work completion Date- 2015
Project Cost- 29.30 Cr.
Survey- 35 Sq. Km. and 105 Km
Description of Work- Study & Analysis of General, Configuration & Strata, Climate, Population, Topographical Survey of City, Need for formulation of New scheme, Proposed scheme, Cost of the scheme, Financial pattern of the scheme, Annual burden.
- Project Management Consultancy Services as below:
- Topographical Survey 35 Sq. Km. and 105 Km Road Survey.
- Soil Investigation of 90 Trial Pits.
- Preparation of Contour Drawing.
- Design of drainage districts.
- Hydraulic Design.
- Preparation of Cost Estimates.
- Preparation of Detailed Project Report.
- Total Length of Sewer Lines: 114 Kms.
- Presentations at GoM.