Since 1999 | ISO Certified

Detailed Project Report for In-Village System Infrastructure in Davangere.

Rural Water Supply & Sanitation Department, Karnataka

Detailed Project Report for In-Village System Infrastructure in Davangere.

Name of Work- Preparation of Detailed Project Report for In-Village System Infrastructure in Davangere, District

Work completion Date- 25.03.2021

Project Cost-Rs. 43.93 Crore

Survey-

  • Topographical Survey (97 Villages)

Description of Work-

  • Topographical Survey (97 Villages)
  • Preparation of Contour Map.
  • Topographical Survey for ESR & GSR
  • L-SECTION drawing of Raw water rising main of 400 mm dia. DI K-9 pipeline having length.
  • L-SECTION drawing of pure water gravity mains feeding different resources of pipeline with varying diameters from 100 mm to 300 mm.
  • Typical drawing of connections for proposed Service Reservoirs with varying capacities
  • Drawing & Design of Distribution Line
Open chat
1
Hello
How can we help you?