Name of Work- Consultancy services for Preparation of Detailed Project Report for 2 Lanning of Road under Beed Municipal Council- Feasibility Study for Widening to two lane
Work completion Date- 30.01.2011
Project Cost- 140 Crores
Survey-
- Surveys: Traffic surveys, Studies & Analysis. Topographic surveys, Soil surveys.
- Traffic Assessment –regular and special counts of traffic. Accident data, village maps.Origin and Destination data collection, turning movement counts, speed delay studies & inventory survey. Axle –load survey. Parking survey.
- Hydrological Studies, Geo-technical Studies, Land width Survey
Description of Work-
Detail description of actual services provided by the firm under different categories:
- Liasoning with PWD.
- Road Inventory
- Surveys: Traffic surveys, Studies & Analysis. Topographic surveys, Soil surveys.
- Traffic Assessment –regular and special counts of traffic. Accident data, village maps.
Origin and Destination data collection, turning movement counts, speed delay studies
& inventory survey. Axle –load survey. Parking survey.
- Hydrological Studies, Geo-technical Studies, Land width Survey.
- Preparation of Land acquisition details for widening to two lane road.
- Preliminary design & block cost estimate preparation.
- GAD & structured drawings for each bridge, culvert & CD works
- Detailed Project Report.
- Feasibility Report
- Rough Cost Estimate