Name of Work- Lonavala Municipal Council: Preparation of Detailed Project Report of Storm water Drains for Lonavala Municipal Council under UIDSSMT
Work completion Date- 2015
Project Cost- 60.00 Cr.
Survey- 35 SqKm.
Description of Work- Study & Analysis of General, Configuration & Strata, Climate, Population, Topographical Survey of City, Need for formulation of New scheme, Proposed scheme, Cost of the scheme, Financial pattern of the scheme, Annual burden.
Project Management Consultancy Services as below:
- Topographical Survey of 35 SqKm.
- Soil Investigation of 35 Trial Pits & Bores.
- Preparation of Contour Drawing.
- Rainfall Data analysis for last 30 years.
- Design of drainage districts.
- Hydraulic Design.
- Preparation of Cost Estimates.