Detailed Project Report of Storm water Drains in Lonavala

Name of Work- Lonavala Municipal Council: Preparation of Detailed Project Report of Storm water Drains for Lonavala Municipal Council under UIDSSMT

Work completion Date- 2015

Project Cost- 60.00 Cr.

Survey- 35 SqKm.

Description of Work- Study & Analysis of General, Configuration & Strata, Climate, Population, Topographical Survey of City, Need for formulation of New scheme, Proposed scheme, Cost of the scheme, Financial pattern of the scheme, Annual burden.

Project Management Consultancy Services as below:

  • Topographical Survey of 35 SqKm.
  • Soil Investigation of 35 Trial Pits & Bores.
  • Preparation of Contour Drawing.
  • Rainfall Data analysis for last 30 years.
  • Design of drainage districts.
  • Hydraulic Design.
  • Preparation of Cost Estimates.