Name of Work- Lonavala Municipal Council: Preparation of Detailed Project Report of Water Supply System for Lonavala Municipal Council under UIDSSMT
Work completion Date- 2018
Project Cost- 33.48 Cr.
Survey-
- Topographical Survey, of 35 Sq. Km area.
Description of Work-Study & Analysis of General, Configuration & Strata, Climate, Population, Topographical Survey of City, Rate of water supply & Daily water requirement, Present water supply arrangement, Need for formulation of New scheme, Proposed scheme, Cost of the scheme, Per capita cost of the scheme, Financial pattern of the scheme, Annual burden, Cost of the water per 1000 lit., Revenue Collection.
- Project Management Consultancy Services as below:
- Topographical Survey, of 35 Sq. Km area.
- Preparation of Contour Map.
- Topographical Survey for ESR & GSR
- L-SECTION drawing of Raw water rising main of 400 mm dia. DI K-9 pipeline having length 2750 m & discharging 10 mld water.
- L-SECTION drawing of pure water gravity mains feeding different reservoirs of DI-K-7 pipeline with varying diameters from 100 mm to 300 mm with Total lengths from 12640m.
- Typical drawing of connections for proposed Service Reservoirs with varying capacities from 1 lakh to 11 lakh lit.
- Distribution Line 106 Kms.