Narrative Description of Project :

Study & Analysis of General, Configuration & Strata, Rainfall & Climate, Population, Rate of water supply & Daily water requirement, Present water supply arrangement, Existing Sewerage Arrangement & Need for Sewerage system, Design criteria, Proposed scheme, Cost of the scheme, Per capita cost of the scheme, Financial pattern of the scheme, Annual burden, Taxation

 

Actual Services provided by Suncon:

  • Existing domestic population & population projection by Geometrical & Incremental increase method up to year 2040.
  • Calculation of ward wise population projection & densities for year 2001, 2009, 2025 & 2040.
  • Collection of list of existing Hotels, Guest houses, Hostels, Training centers, Hospitals etc. & their present & future water demands.
  • Preparation of standards used for Sewerage project as per CPHEEO.
  • Preparation of Sewerage districts as per the topography & Ward wise distribution of these districts.
  • Preparation of district wise distribution of domestic population.
  • Calculation of Sewerage district wise flow & LPCD for year 2009, 2025 & 2040.
  • Stage wise flow calculation for Pumping station & STP.
  • Raw Sewage sample test report of TDMC.
  • Collection of Trial pit Results for TDMC.
  • Hydraulic design & Estimates of Sewage collection system in RCC NP-2 & NP-3 Class pipe with varying diameters from 150 mm to 400 mm of length 94 km.
  • Design, Estimate & drawing of 2 pumping stations having circular sumps with varying diameters from 5 m to 9.5 m.
  • Design & Estimate of 2 pumping machineries with submersible non-clog sewage pumps varying from 17.5 HP to 120 HP having varying discharging capacity from 11.45 lps to 192.60 lps against the varying total head from 21 m to 47 m.
  • Economical Design, Estimate & L-SECTION drawing of 2 rising mains of DI- K-9 pipe lines with varying diameters from 200 mm to 450 mm having varying length from 750 m to 1400 m.
  • Design, Estimate & Flow diagrams of Conventional Sewage treatment plant with Inlet Chamber, Screens, Grit Chamber, Sludge digester etc. of capacity 8.40 mld.
  • Financial pattern of the scheme is formulated.
  • Total Annual Burden, Calculation of Proposed Sewerage connections & the proposed sewerage tax collection statement is studied.